By François Biber
Designs for a perimeter highway around Saskatoon continue to change but the billions it’s going to cost haven’t.
“It's in the very early stages right now,” said ministry of highways spokesperson Doug Wakabayashi. “What we're doing is just drawing lines on a map to see where things can go so there isn't a timeline for construction yet for either.”
The latest public feedback and studies show there isn’t a solid business case to have the perimeter highway cover Saskatoon’s... // Read Full Article